| The area was, for a change, on the fifth floor of the Phipps Mckinnon building in downtown Edmonton and VT had windows!!! Three AVR2s were installed with a row of bays with the production monitors mounted in them between us and the production area. A 'fourth' machine, in the shape of hired VR3000, was fixed with camera tape to the end of the bay. The Off Tube had windows surrounding it, but they were fitted with curtains, Amazingly, the building is still there as is the hotel - it was the Four Seasons in 1978. |